All Deliverables will be submitted to Latin American Space Challenge (LASC) per the instructions provided to the teams in the RCSM and SCSM. Each relevant deliverable description will facilitate submission of that deliverable or will be communicated to teams as is determined by LASC Organization. The scheduled due dates of all required deliverables are recorded in the LASC Event Guidance and Milestones (EGM) document.
Progress Update 1 and Mission Patch
The Progress Update 1 will record progression in the project's technical characteristics during development. Event officials understand not all technical details will be known until later in the design process. Therefore, the Progress Update 1 will be evaluated based only on their timeliness and completeness.
References: RKT 1.4.1., RKT 1.4.2., and RKT 1.4.3. of the RCSM, and SAT 1.4.1., SAT 1.4.2. and SAT 1.4.3. of the SCSM.
Mission Patches are emblems designed and worn by astronauts and people affiliated with a mission, such as Rocketeers and Satelliteers. Each team shall submit an appropriate Mission Patch for each Selected Mission during the Progress Update 1. Team’s logo will not be accepted as a mission patch. Late submission will be accepted, but the mission may be penalized by not timely submitting a Mission Patch.
References: RKT 1.4.4 of the RCSM, and SAT 1.4.4. of the SCSM.
Progress Update 1 - Rocket Challenge
Deadline: 29 June 2025
Progress Update 1 - Satellite Challenge
Deadline: 29 June 2025
Safety.
Launch Control Center.
Launch Pads.
Recovery.